How to Build a Xinchuang and Domestic Private-Deployment Compatibility Checklist

Summary: Domestic-stack private deployment involves more than an operating system: CPU architecture, database, middleware, browser, and third-party components also matter. For dashboards, BI, software, and digital twins, a workable approach is to lock the target environment and versions, build a dependency matrix, test a minimal viable path, then run migration regression, performance, and permission tests while retaining installation, test, issue, and rollback evidence.

Project note: Judge domestic-stack compatibility against a named and versioned target environment, repeatable test steps, and reviewable evidence. Keep untested components marked “To verify” until testing supports a conclusion.

Server-room environment representing private deployment of business data systems
Illustration of a private-deployment environment. It does not represent any specific OS, database, middleware, client project, or certification result.

Break “Xinchuang compatibility” into an acceptable scope

Projects may use terms such as domestic-stack adaptation, Xinchuang compatibility, domestic hardware and software, private deployment, or internal-network deployment together. They are not identical acceptance targets. Private deployment means the system runs on infrastructure and networks controlled by the client. Domestic-stack adaptation also requires specific products, versions, CPU architectures, replacement scope, and compatibility requirements.

Requirement wordingClarifyAcceptable output
Supports a domestic operating systemProduct, version, CPU architecture, desktop or server editionInstallation record, service status, core-workflow regression, and resource use
Supports a domestic databaseDatabase product, version, deployment mode, data volume, and migration windowSchema migration, data reconciliation, SQL regression, performance, backup and recovery records
Supports a domestic browser or endpointBrowser engine, version, GPU, resolution, and security policyPage, chart, WebGL, video, export and print, and sustained-operation tests
Passed Xinchuang acceptanceAcceptance basis, product catalog, assessor, evidence format, and responsible partyThe project-agreed test report; certification or formal assessment must come from an authorized party

Step 1: Freeze the target environment and specific versions

Record at least server CPU architecture, OS distribution and patches, database product and version, middleware or runtime, reverse proxy, container platform, browser and endpoint, GPU driver, internal domain certificate, authentication, audit logs, backup platform, and external APIs. If the project specifies products such as Kylin, UnionTech UOS, Dameng, Kingbase, or Highgo, still confirm exact versions and deployment modes.

If the final environment is unavailable, build an equivalent test environment and note every difference. Differences in CPU architecture, kernel, browser policy, database version, or security component may make earlier test results inapplicable.

Step 2: Build a dependency matrix to expose overlooked paths

ModuleCommon riskSuggested test
CPU and operating systemWrong binary architecture, missing system libraries, permission or path differencesInstallation and startup, service autostart, directory rights, time zone, and resource limits
DatabaseSQL dialect, field types, functions, case sensitivity, pagination, and driver differencesSchema migration, critical SQL, batch processing, indexes, transactions, and reconciliation
Middleware and runtimeJDK, Node, container-image, messaging, and cache versions do not matchBuild, startup, connection, exception recovery, and upgrade rollback
Browser and display endpointMissing fonts, WebGL support, video codec, scaling, and security policyMain pages, interactions, exports, printing, fullscreen, and long-running operation
GIS and digital twinMap services, offline tiles, coordinate systems, model loading, and GPU performanceRealistic data coverage, representative models, point interactions, and weak-network recovery
Identity and securityIncomplete single sign-on, LDAP, domestic cryptography certificates, permission filters, or auditsLogin and logout, timeout, negative authorization tests, log retrieval, and certificate renewal
Third-party servicesMaps, messaging, storage, printer controls, or commercial components cannot be replacedLicense checks, network access, alternatives, and failure handling

Step 3: Validate high-risk prototypes before planning full migration

Prototype tests should target the issues most likely to change the approach: database drivers and critical SQL, ARM binary dependencies, browser WebGL and video, single sign-on, offline maps, file export, and fonts. After those pass, plan full data migration, feature regression, performance, and launch windows.

  1. Choose one dataset, page, and workflow representative of real complexity.
  2. Run the complete path from installation to operation in the target environment; do not reuse an unexplained old build.
  3. Record commands, versions, configuration differences, input data, expected and actual results, and issues.
  4. Classify failures as fixable, requiring replacement, requiring a client-environment change, or currently unsupported.
  5. Reconfirm scope, schedule, cost, responsibility, and acceptance conditions from the findings.

Database migration must also prove the application works after import

Beyond table and record counts, check field types, defaults, primary keys and sequences, time zones, nulls, character sets, precision, stored procedures, triggers, views, indexes, and permissions. Rerun creation, updates, queries, pagination, aggregations, batch operations, and exports in the app. Reconcile critical reports with the same filters.

Performance testing needs realistic data volume, concurrency, network, and hardware. Queries working on development samples do not prove large aggregations, map points, or scheduled jobs will meet targets in production.

Accept dashboards, GIS, and digital twins on the final endpoint

These systems are especially sensitive to browser engines, GPU drivers, WebGL, fonts, resolution, scaling, video codecs, and long-running operation. Do not accept them only on a developer's laptop. On the actual large-screen controller, office workstation, or staffed terminal, test first load, transitions, interactions, fullscreen, outages, reconnection, sustained runtime, and resource use.

For map tiles, geocoding, 3D engines, and commercial controls, also check internal-network deployment, licensing, offline resource updates, and alternatives. Without internet access, prepare local assets and an update process.

Prepare migration in both directions and evidence for rollback

At a minimum, the migration plan states downtime window, incremental-data handling, checkpoints, business approver, backup location, rollback trigger, and rollback owner. “Keep the old server” is not a complete rollback plan. Verify that the old system can take traffic again, how new data will be reconciled, and how duplicate writes or losses will be prevented during switching.

Keep installation logs, version screenshots, configuration baselines, test cases, data reconciliation, performance results, issue closure, backup and recovery, and rollback exercises in one evidence set linked to each checklist row.

Grade compatibility conclusions against concrete evidence

ConclusionMeaningEvidence needed
VerifiedTested in the agreed versions and representative environment against acceptance criteriaEnvironment baseline, steps, results, logs or screenshots, and approver
Conditional passWorks only with specified configuration, patches, replacement components, or constraintsConstraint notes, configuration requirements, remaining risks, and retest records
To verifyTarget environment, data, permissions, or test conditions are missingOutstanding conditions, owner, and planned test date
Not compatibleThe current path cannot meet requirements and needs replacement or scope changesFailure, cause, impact, and alternative

Frequently asked questions

Is Xinchuang adaptation just replacing the server operating system?

Usually not. Check CPU architecture, database and driver, middleware, browser, fonts and export, mapping and 3D components, authentication, audit logs, backups and recovery, and third-party licenses.

Can compatibility be promised before the final target environment exists?

Avoid a firm commitment before products, versions, CPU architecture, deployment mode, and target endpoint are known. List risks and tests first, then issue a compatibility conclusion after testing.

Is importing data enough to migrate an existing system to a domestic database?

Not necessarily. Check SQL dialect, field types, case sensitivity, time handling, pagination and functions, driver pools, stored procedures, indexes, migration reconciliation, and performance differences.

What extra tests do dashboards and digital twins need?

On the actual browser, GPU, and resolution, test WebGL, fonts, charts, video, map tiles, 3D models, exports and printing, sustained runtime, and outage recovery.

Does this checklist prove the product has Xinchuang certification?

No. It organizes project scope, compatibility tests, and acceptance evidence; it does not replace vendor compatibility certificates, assessment reports, procurement catalogs, or decisions by competent authorities.

Download the checklist and related resources

Use the Xinchuang and Domestic Private-Deployment Compatibility Checklist (Chinese) to record environments, adaptation requirements, test methods, risks, conclusions, and evidence. Continue with What to Prepare for Private Deployment of a Data Dashboard, How to Agree on Software Project Changes and Source-Code Handover, and How to Maintain a Data Dashboard After Launch.